Remodeling the whole house, room by room or all at once
Whole-home remodels in Simi Valley: phasing, living on site, what older tract homes hide in the walls, and why one B contractor should hold the whole contract.
Licensed general building contractor since 2008: CSLB #925152, qualifier Paul V. Aguilar.

A whole-home remodel changes several rooms and systems in one project: layouts, kitchens and baths, flooring, lighting, windows, sometimes walls. It is exactly the kind of job California built the B license for, because it combines many unrelated trades under one contract and one responsible licensee.
The biggest decision is sequencing. Doing everything at once is faster and usually cheaper per square foot, but it often means moving out. Phasing lets you stay, at the cost of a longer schedule and more setup and cleanup between phases.
All at once or in phases
If the plan moves walls, rewires most of the house or replaces flooring everywhere, living through it is hard. A single phase with the house empty means one permit sequence, one set of inspections for each stage, and trades that can work across rooms without waiting.
Phasing works when the house divides cleanly, for example bedrooms in one phase and kitchen and living areas in the next. Each phase should leave a working bathroom and a place to cook, and each needs its own clear scope in the contract so payments track what is finished.

How a job runs
Walk-through and written estimate
We look at the space with you, measure, and put the scope and price in writing. The estimate is free.
Contract and permit
A written contract with the terms California law requires, and the City of Simi Valley permit when the work needs one.
Build, inspect, walk through
The inspections the permit calls for, a final walk-through with you, and payments that follow the work as it is done.
What older Simi Valley homes reveal
Houses built from the 1960s through the 1980s in neighborhoods like Texas Tract and Rancho Simi can hold surprises once walls open: older wiring methods, plumbing near the end of its life, or past work done without a permit. When a remodel touches those systems, the inspector can require the affected parts to meet current code.
A careful estimate names these unknowns instead of hiding them. Ask how the contract handles concealed conditions and how a change order will be priced, in writing, before the extra work happens. CSLB's contract guide is clear that extra work and change orders must be in writing and become part of the contract.

Who holds the contract
Hiring separate contractors for electrical, plumbing, drywall and finishes puts you in charge of scheduling them, checking their licenses and handling the gaps between them. Under a B license, one contractor holds the prime contract and answers for the whole job, including any specialty work it subcontracts to properly licensed contractors.
- One written contract covering every trade in the scope
- One payment schedule tied to finished stages
- One party responsible to the City for the permit and inspections

Questions homeowners ask
Does a whole-home remodel always need plan check?
Not always. The City reviews kitchen and bathroom remodels without a structural component in up to one week. Moving or removing walls, cutting new openings or changing the structure sends the project into full plan check.
Should I move out during the remodel?
If the scope covers the kitchen, most bathrooms and the flooring at the same time, moving out usually shortens the job and lowers cost. If you need to stay, plan phases that keep one bathroom and a cooking area working throughout.
What happens if unpermitted past work is found?
It depends on what it is and whether your project touches it. Often the inspector requires it to be corrected or documented as part of the new permit. It is better to find it during your remodel than during a sale.
Can I supply my own materials?
You can, but agree in writing on who orders, who receives and who is responsible for damage or delays. Owner-supplied fixtures that arrive late hold up inspections for everyone.
Sources
Facts on this page last verified: .
- City of Simi Valley Building & Safety, Online Permit Submittal Instructions: https://www.simivalley.org/departments/environmental-services/building-safety-division/online-permit-submittal-instructions (2026-10-05)
- CSLB, Contracting for Success: A Contractor's Guide to Home Improvement Contracts: https://www.cslb.ca.gov/Resources/GuidesAndPublications/ContractingForSuccess.pdf (2026-10-05)
- California Business and Professions Code section 7057: https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC§ionNum=7057. (2026-10-05)

A written estimate, free
We measure the space with you and put the scope and the price in writing. Under California law the down payment can never be more than $1,000 or 10 percent of the price, whichever is less.

Request a free estimate
Call
Monday to Saturday, 7am to 6pm
CSLB #925152 · B General Building Contractor